Sawmill and Timber Yard Solutions

Long, heavy, awkward loads across soft and debris-strewn ground: timber work pairs the DF30’s yard duty with the RT40’s off-pad capability where the ground gives up.

4,000 kg
RT40 rated capacity @ 600 mm for bundled timber
30%
RT40 gradeability for loaded ramp and pad work
6,000 mm
DF30 / DF50 maximum mast option for stacked lumber

Scenario challenges

What drives the spec here

Long loads, long levers

Timber bundles push load centers far forward; capacity is read from the derated chart or not at all.

Ground that varies by season

Sawdust pads, ruts and rain change the ground weekly; tires and drive layout answer it.

Continuous outdoor cycles

Sawmills run daylight-to-dark; fuel, filtration and service discipline carry the shift.

Selection logic

How to spec the fleet for this site

Decision factorWhat to check on siteHow this solution is specified
Load geometryLong bundles move the center of gravity out.Read the derated capacity at the real load center — the load chart ships with every RT40 and DF quotation.
Seasonal groundPads and lanes soften and recover.DF30 on prepared yard surfaces; RT40 with aggressive-lug tires and 4WD where the pad ends — 30% gradeability, oscillating axle.
Dust and debrisSawdust and bark load the filtration.Dry-type air filter on the DF30; service intervals per the diesel maintenance schedule, shortened for the dust.
Stacking and stagingLumber stacks high and heavy.Mast options to 6,000 mm on the DF line; stacking discipline per the operator checklist.

Recommended models

Recommended models

['
\n \n

DF30 — 3.0 t Diesel Counterbalance Forklift

\n

Yard and pad duty at 3.0 t — torque converter, 2-stage mast, dry-type filtration.

\n
  • Rated capacity 3,000 kg @ 500 mm
  • Turbocharged diesel, 36.8 kW; 2-stage mast
  • CE
\n
', '
\n \n

RT40 — 4.0 t Rough-Terrain Forklift (4WD)

\n

Off-pad capability — 4.0 t 4WD, aggressive-lug tires, 30% gradeability.

\n
  • Rated capacity 4,000 kg @ 600 mm
  • 30% gradeability; oscillating castor axle
  • CE
\n
']

Match the truck to the pad and the bundle

Send your bundle lengths, weights and yard ground profile — engineering responds within 12 hours on average.

Request a Quote

Other working scenarios

Brick yards, steel mills, logging and construction — the heavy-material environments.

Related reading

The rough-terrain selection guide and the RT vs telehandler comparison cover the ground-and-geometry decisions.